Gallery
The application, not an illustration of it.
Every image on this site is a screen capture of Lola3d running, driven through its own interface, on the design scenarios its test suite builds. Nothing here is a render, a mock-up or a drawing of a product that does not exist yet.
These are showcase models. Open one.
Every model in these captures is built by the test suite, step by step, through the public API — and you can open any of them, replay how it was made, and take it apart.